Built-Up Roofs

Built-Up Roofs

Following membrane manufacturer’s specifications apply roof membrane over roof edge. Install simple metal edging (by installer 0 to provide a raised edge for run-off protection. Apply flashing membrane to metal edging.

Install secure bar with screws (provided). Place tension clips onto secure bar’s top seating area and snap fascia into position. Insert fascia splice plate at joints.