Stockman Bank

Painted Brake Metal

Project: Aluminum painted brake metal for Stockman Bank in Missoula, MT

General Contractor: Jackson Contracting Group

Architect: OZ Architects

SubContractor: TC Glass

Product: SAF supplied 0.125″ aluminum painted brake metal coated with a Valspar Traffic Tan, AAMA 2605, to TC Glass in Great Falls, MT.