LEWISTON QUEENSTON BRIDGE
Albany, NY
Albany, NY
Project Details
ADDRESS
Albany, NY
General Contractor
Turner Construction Company
PRODUCTS USED
Metal Fabrication
SAF supplied both fabricated stainless steel and anodized brake metal panels for installation on the Lewiston Queenston Bridge. The material used was a combination of 14 gauge stainless steel and .090 – 0.125 anodized aluminum brake metal. The anodized panels were intentionally installed and designed to show color variation. The panels above and below the windows are stainless steel highlighting color variation.
Project Photos