skip to Main Content

SURPLUS SALES – ACM FLAT SHEETS, MISC METAL Shop Now

Due to LTL shipping industry constraints, effective immediately, SAF can no longer ship material longer than 19’ via LTL Common Carrier

GRAVEL STOPS…

Roof gravel stops are used at the roof termination on the perimeter of a structure for a variety of roof types such as EPDM Singly-Ply, Thermoplastic, Modified Bitumen and Built-Up roofing systems. These systems are designed to protect the structure from damage due to water penetration while offering superior wind uplift resistance.

Our gravel stops and fascia systems come in a variety of types, styles, profiles, materials, thicknesses and finishes. Each system is customizable to give a unique and professional finish to low sloped roof edges for commercial applications.

PRESS-LOC® GRAVEL STOPS

Our Press-LOC (PLGS) Gravel Stop is designed to accommodate the strict performance criteria of today’s advanced commercial roofing systems. Press-LOC allows you to install metal edging to be flashed in accordance with commercial roof membrane manufacturer specifications. Our Secure Bar profile fully encapsulates the roof membrane to ensure a watertight and leak proof edge.

The PLGS system comes in five design collections: Standard, Traditional, Geometric, Eclectic & Crown Collection each with nominal fascia heights of 4.5”, 6” & 8”.

The unique and simple Press-LOC Gravel Stop design makes installation fast and economical, while providing a leak-proof gravel stop edge that is extremely resistant to wind uplift. Simply fasten the Press-LOC secure bar to roof’s edge (screws provided), place tension clips at 24″ on center, and snap on the Press-LOC fascia…it’s that simple.

PRESS-LOC GRAVEL STOP – STANDARD COLLECTION

Press-Loc-Stanard Press-Loc Gravel Stop – StandardTested to meet ANSI/SPRI/FM 4435/ES-1 Wind Design Standard for Edge Systems Test Method RE-2 for edge flashing. 
PLGS-4.5
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION

PRESS-LOC GRAVEL STOP – TRADITIONAL COLLECTION

TCR Roman Profile Gravel Stop
PLGS.TCR-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.TCR-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.TCR-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
TCC Colonial Profile Gravel Stop
PLGS.TCC-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.TCC-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.TCC-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
TCB Batten Profile Gravel Stop
PLGS.TCB-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.TCB-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.TCB-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
TCN Contemporary Profile Gravel Stop
PLGS.TCN-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.TCN-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.TCN-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION

PRESS-LOC GRAVEL STOP – GEOMETRIC COLLECTION

GC1 PLGS.GC1 Gravel Stop
PLGS.GC1-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EGC1-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.GC1-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
GC2 PLGS.GC2 Gravel Stop
PLGS.GC2-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.GC2-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.GC2-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
GC3 PLGS.GC3 Gravel Stop
PLGS.GC3-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.GC3-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.GC3-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
GC4 PLGS.GC4 Gravel Stop
PLGS.GC4-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.GC4-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.GC4-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION

PRESS-LOC GRAVEL STOP – ECLECTIC COLLECTION

EC1 PLGS.EC1 Gravel Stop
PLGS.EC1-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EC1-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EC1-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
EC2 PLGS.EC2 Gravel Stop
PLGS.EC2-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EC2-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EC2-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
EC3 PLGS.EC3 Gravel Stop
PLGS.EC3-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EC3-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EC3-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
EC4 PLGS.EC4 Gravel Stop
PLGS.EC4-4
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EC4-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.EC4-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION

PRESS-LOC GRAVEL STOP – CROWN COLLECTION (4.5″ NOT AVAILABLE)

CC1 PLGS.CC1 Gravel Stop
PLGS.CC1-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.CC1-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
CC2 PLGS.CC2 Gravel Stop
PLGS.CC2-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.CC2-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
CC3 PLGS.CC3 Gravel Stop
PLGS.CC3-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.CC3-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
CC4 PLGS.CC4 Gravel Stop
PLGS.CC4-6
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION
PLGS.CC4-8
– CAD
– SPECIFICATION
– SUBMITTAL
– INSTALLATION

CONVENTIONAL GRAVEL STOPS

These traditional gravel stops are also commonly referred to as “drip edge, eave trim & gutter aprons” for flat or low slope roofs. Manufactured with a 4” deck flange and pre-punched with elongated fastening slots for thermal movement. Joint detail is a 4” concealed splice plate with a 3/8” expansion reveal. These systems can also be modified for a 4” lap joint.

Gravel-stops-G-1 Gravel-stop-G-2
GS-1
– CAD
– SUBMITAL
GS-2
– CAD
– SUBMITAL

FLOW-THRU GRAVEL STOP (FTGS)

FTGS is our oldest solution for retaining ballast stone on a single ply roof while allowing water flow off. Manufactured from 0.040” aluminum and perforated on its face side with 3/16” holes @ ¼” staggered centers allows a 50% open face area without greatly affecting the strength. Joint treatment is a 4” factory notched lap joint which must be sealed as required with the primary roof membrane. FTGS can also be used with aggregate surfaced built-up roof systems for absolute positive drainage. Custom sizes are available.

Gravel-stops-Flow-Thru design
FLOW-THRU
– CAD
– SUBMITAL